虎ノ門二丁目プロジェクト概要

Location
Transportation




Completion
Site area
Building area
Total floor area
Structure
Size
Height
Design/management
Construction


Owner

      /2-9-1, 3, 4, 6, Toranomon, Minato-ku, Tokyo
      /Directly connected to Tokyo Metro Hibiya Line
       Toranomon Hills Station”※Scheduled to open in July 2023
       4-minute walk from Tokyo Metro Ginza Line “Toranomon Station”
       9-minute walk from Tokyo Metro Ginza Line/Namboku Line
       “Tameike-sanno Station”
      /March 2022 (scheduled)
      /1,702,98㎡
      /1,464,16㎡
      /26,226,40㎡
      /Steel structure, partially steel-framed reinforced concrete structure
      /17 floors above ground, 2 floors below ground, 3-floor penthouse
      /97.05m
      /Yamashita Sekkei Inc.
      /[Construction]Obayashi Corporation
       [Electricity, air conditioning, hygiene]Kyudenko Corporation
       [Elevators] Mitsubishi Electric Corporation
      /Toyo Kaiji Co..Ltd

Power receiving system
Emergency generator

Communication equipment
Broadcast equipment
Plumbing equipment



Fire extinguishing equipment




Disaster prevention equipment
Security
BCP



Elevators

Parking lot
Bicycle parking lot
Environmental evaluation performance

/High voltage 6.6kV 2-circuit power reception
/[For the building]1,500kVA, oil tank capacity 47,600ℓ (including tenant capacity)
 [For tenants] Maximum 500kVA can be set, oil tank capacity 20,000ℓ available
/RT room that supports multiple communications
/Emergency broadcast
/[For the building]Water supply: Water tank pump direct delivery method
  Drainage: Combined drainage of miscellaneous wastewater and sewage
 [For tenants]Water supply: Water tank pump direct delivery method
  Drainage: Combined drainage of miscellaneous wastewater and sewage
/Sprinkler system throughout the building, connectable water
  supplying pipe system,indoor fire hydrant equipment
  Nitrogen gas fire extinguishing equipment (electrical room)
  (generator room) (mechanical parking lot)
  Foam fire extinguishing equipment (parking lot)
/Disaster control center
/Surveillance cameras, passive sensors
/Substation 2-circuit power reception, city gas intake by intermediate
  pressure B 72 hours of power supply (exclusive space owned by
  tenants 15VA/㎡) (separate contract required)
  Tenant generators can be added (500kVA gas turbine generator assumed)
/1 elevator for human cargo and emergency use (up to 20 people)
  Contactless IC card reader inside the elevator cages and rental room entrances
/Mechanical parking lot (28 normal cars, 26 high-roof cars),
  cargo handling parking lot (5 cars)
/For tenants (61 cars), for the public (50 cars)
/CASBEE S rank certified

Standard floor rental room area
Floor load
Ceiling height
Floor specifications
Capacitance
Ceiling
Lighting
Air conditioning system
Communication equipment
Common antenna television system
Bathroom

Hot water supply room

 /1,047,81㎡
 /490kg/㎡ (heavy duty zone 800kg/㎡)
 /3,000mm
 /OA floor 100mm
 /50VA/㎡ (10VA/㎡ can be added)
 /600 square grid system ceiling
 /LED lighting
 /Outdoor air processing unit + individual packaged air conditioner system, airflow window
 /Optical cable lead-in pipeline
 /UHF/BS/CS110°
  digital terrestrial reception is possible
 /Women’s and men’s bathroom installed in one location on each floor
  multi-purpose bathroom installed in one location on each floor
 /Installed in one location on each floor

Location

2-9-1, 3, 4, 6, Toranomon, Minato-ku, Tokyo

Transportation

Directly connected to Tokyo Metro Hibiya Line
Toranomon Hills Station”※Scheduled to open in July 2023
4-minute walk from Tokyo Metro Ginza Line “Toranomon Station”
9-minute walk from Tokyo Metro Ginza Line/Namboku Line
“Tameike-sanno Station”

Completion

March 2022 (scheduled)

Site area

1,702,98㎡

Building area

1,464,16㎡

Total floor area

26,226,40㎡

Structure

Steel structure, partially steel-framed reinforced concrete structure

Size

17 floors above ground, 2 floors below ground, 3-floor penthouse

Height

97.05m

Design/management

Yamashita Sekkei Inc.

Construction

[Construction]Obayashi Corporation
[Electricity, air conditioning, hygiene]Kyudenko Corporation
[Elevators] Mitsubishi Electric Corporation

Owner

Toyo Kaiji Co..Ltd

Power receiving system

High voltage 6.6kV 2-circuit power reception

Emergency generator

[For the building]1,500kVA, oil tank capacity 47,600ℓ (including tenant capacity)
[For tenants] Maximum 500kVA can be set, oil tank capacity 20,000ℓ available

Communication equipment

RT room that supports multiple communications

Broadcast equipment

Emergency broadcast

Plumbing equipment

[For the building]Water supply: Water tank pump direct delivery method
Drainage: Combined drainage of miscellaneous wastewater and sewage
[For tenants]Water supply: Water tank pump direct delivery method
Drainage: Combined drainage of miscellaneous wastewater and sewage

Fire extinguishing equipment

Sprinkler system throughout the building, connectable water
supplying pipe system,indoor fire hydrant equipment
Nitrogen gas fire extinguishing equipment (electrical room)
(generator room) (mechanical parking lot)
Foam fire extinguishing equipment (parking lot)

Disaster prevention equipment

Disaster control center

Security

Surveillance cameras, passive sensors

BCP

Substation 2-circuit power reception, city gas intake by intermediate
pressure B 72 hours of power supply (exclusive space owned by
tenants 15VA/㎡) (separate contract required)
Tenant generators can be added (500kVA gas turbine generator assumed)

Elevators

1 elevator for human cargo and emergency use (up to 20 people)
Contactless IC card reader inside the elevator cages and rental room entrances

Parking lot

Mechanical parking lot (28 normal cars, 26 high-roof cars),

Bicycle parking lot

cargo handling parking lot (5 cars)

Environmental evaluation/div>

For tenants (61 cars), for the public (50 cars)

performance

CASBEE S rank certified

Standard floor rental room area

1,047,81㎡

Floor load

490kg/㎡ (heavy duty zone 800kg/㎡)

Ceiling height

3,000mm

Floor specifications

OA floor 100mm

Capacitance

50VA/㎡ (10VA/㎡ can be added)

Ceiling

600 square grid system ceiling

Lighting

LED lighting

Air conditioning system

Outdoor air processing unit + individual packaged air conditioner system, airflow window

Communication equipment

Optical cable lead-in pipeline

Common antenna television

UHF/BS/CS110°

system

digital terrestrial reception is possible

Bathroom

Women’s and men’s bathroom installed in one location on each floor
multi-purpose bathroom installed in one location on each floor

Hot water supply room

Installed in one location on each floor